Click on image to enlarge
|
£ 5,372 GBP
Location Hurghada
District Al Bahr Al Ahmar
View Resort
Bedrooms 1
Bathrooms 1
Carpark 1
Finance available Yes
Size 22m2
Consultant's name Stefan
Unit ref. no. 266
|
Description
RECORD BREAKING OFFER!! The lowest prices we have ever seen for a development with great facilities. Brought to you by one of Hurghadas leading developers since 1993.
If you missed out on a studio in the previous developments – Tiba Towers 2 or Tiba Heights, then now is your chance! Tiba Palace is the latest addition to the highly successful “Tiba” family of resorts. It is a stunning four floor building with quality facilities. Apartment types range from the very cheapest Studios, to 1 Bedroom and 2 Bedroom apartments. You can choose from Swimming Pool Terrace locations to higher level apartments with beautiful circular balconies.
LOCATION
Located in the Al Ahyaa District, the fastest developing region in Hurghada where all the construction focus lies. Other developments are complete here and succesfully being rented. Carrefour supermarket chain is opening a superstore in this district, they do their own extensive market research on locations for their new stores so this acts as good strength for the future of the area. The local public beach is a 600 metre walk.
Facilities & Amenities
- Located just ten minutes' walk from a public beach
- Good location in the heart of the fast evolving Al Ahyaa area of Hurghada.
- Large swimming pool on site
- Centralized satellite television, telephone and internet links to all apartments
- High speed internet to all apartments
- Ten years' builders' guarantee
- Low annual maintenance fee of just LE2000 (GBP240/EUR270)
Features & Fittings
- Polished ceramic tiles throughout
- Tiling in bathrooms and kitchens
- Windows and doors installed throughout
- Electrical installation with power points and light switches
- Pre-installation for digital TV and telephone sockets
- Stainless steel sink with mixer taps in kitchen area
- White porcelain sanitary fittings in bathroom (toilet, sinks and bath/shower) with mixer taps
- Pre-installation for air conditioning.
Construction
Complete: June 2012