Click on image to enlarge
|
£ 9,091 GBP
Location Hurghada
District Al Ahyaa
Bedrooms 1
Bathrooms 1
Carpark 1
Finance available Yes
Size 38m2
Consultant's name Stefan
Unit ref. no. 270
|
Description
BEST VALUE in the RED SEA! Don't Miss Out!!
Another beautiful project from the most recognised developer in the region – TIBA GARDENS is the latest addition to the biggest success story in Egypt – 2010/2011. Fantastic value for money with facilities that match demand such as a Private Swimming Pool, Local Parks, Public Beaches and Shopping Centre.
The developer has now released their fourth project in the Tiba series with the launch of Tiba Gardens, which offers all of the same benefits as , Tiba Towers 2 and Tiba Palace. Located on the opposite side of the street from Tiba Towers 2, Tiba Garden is the closest of all of the Tiba projects to the public beach in El-Ahyaa and also the shopping mall which is under construction.
Such was the demand for this development that the limited number of studios available sold out within a matter of hours, with the cheapest one-bedroom apartments also selling promptly. As a result, if you are interested in buying into the best value development available on the Red Sea today, contact us now to secure your unit before it’s too late.
Facilities & Amenities
- Located just ten minutes' walk from a public beach
- Good location in the heart of the fast evolving Al Ahyaa area of Hurghada.
- Large swimming pool on site
- Centralized satellite television, telephone and internet links to all apartments
- High speed internet to all apartments
- Ten years' builders' guarantee
- Low annual maintenance fee of just LE2000 (GBP240/EUR270)
Features & Fittings
- Polished ceramic tiles throughout
- Tiling in bathrooms and kitchens
- Windows and doors installed throughout
- Electrical installation with power points and light switches
- Pre-installation for digital TV and telephone sockets
- Stainless steel sink with mixer taps in kitchen area
- White porcelain sanitary fittings in bathroom (toilet, sinks and bath/shower) with mixer taps
- Pre-installation for air conditioning.
Construction
Complete: October 2012